Businesses welcoming visitors from Bekasi or Cibubur via the Jabodebek LRT can consider three vOffice virtual office locations along the Sudirman–Thamrin corridor: Sudirman 7.8, The City Tower, and Atria Sudirman. All three are accessible from the Dukuh Atas area, but they call for different final connections. Sudirman 7.8 is closest to Setiabudi Astra MRT, The City Tower is on the Thamrin side, and Atria Sudirman is more naturally approached through Bendungan Hilir MRT.
Key Takeaways
- Dukuh Atas BNI LRT Station is part of an interchange area serving the MRT, the KRL at Sudirman Station, and the airport train at BNI City.
- vOffice lists Sudirman 7.8 as approximately one minute from Setiabudi Astra MRT Station, without specifying the travel mode behind that estimate.
- A vOffice article estimates that The City Tower is approximately a nine-minute walk from Dukuh Atas BNI MRT Station.
- For Atria Sudirman, vOffice describes an MRT trip from Dukuh Atas BNI to Bendungan Hilir followed by an approximately three-minute walk. Allow additional time to transfer from the LRT to the MRT.
Choose the onward connection that fits your destination
Indonesia’s Ministry of Transportation identifies Dukuh Atas as an interchange area for the Jabodebek LRT, Jakarta MRT, KRL, airport rail service, and Transjakarta. For someone arriving by LRT, the next decision is whether to continue on foot or change to the MRT. The LRT and MRT stations both use the name Dukuh Atas BNI, but they are separate stations. Allow time to move between them.
The comparison below uses journey stages published by vOffice. These figures do not represent a guaranteed trip from the LRT platform to a vOffice reception desk. Station exits, waiting time, crossings, and the building entrance will affect the full journey.
| vOffice location | From Dukuh Atas BNI LRT | From Setiabudi Astra MRT |
|---|---|---|
| Sudirman 7.8 | Transfer to Dukuh Atas BNI MRT, travel one stop to Setiabudi Astra, then continue to the building. A vOffice article estimates about five minutes on the MRT and about one minute for the final approach. Add transfer and waiting time. | The vOffice service page lists an approximately one-minute trip to the building but does not specify the travel mode. |
| The City Tower | Head towards the Dukuh Atas BNI MRT side, then walk to the building. vOffice estimates about nine minutes on foot from the MRT station. Add the time needed to reach that starting point from the LRT platform. | Take the MRT one stop to Dukuh Atas BNI, then allow about nine minutes to walk from the MRT station to the building. Waiting and station exit time are additional. |
| Atria Sudirman | Transfer to Dukuh Atas BNI MRT, continue to Bendungan Hilir, then walk. vOffice estimates about four minutes on the MRT and about three minutes on foot. Add the LRT-to-MRT transfer time. | Take the MRT one stop to Bendungan Hilir, followed by an approximately three-minute walk according to vOffice. Allow time to wait for the train and leave the station. |
Notes from vOffice Consultants
Use the full station and transport names in a meeting invitation. “Dukuh Atas BNI” alone may lead an LRT passenger to expect the building immediately outside their platform. Send the building map and leave time for the station transfer.
Do your visitors often arrive by LRT?
Compare addresses and facilities across vOffice’s network of more than 40 Indonesian locations.
Three virtual office locations along Sudirman and Thamrin
Each address fits a different visiting pattern. Before choosing one, consider which station your guests use, where you usually meet clients, how often you collect mail, and the facilities included in your preferred plan. For more background on the area, read vOffice’s guide to office buildings near Sudirman Station.
Sudirman 7.8: continue through Setiabudi Astra MRT
Sudirman 7.8 is an option for startups, consultants, and professional service firms that meet clients around Jalan Jenderal Sudirman or Citywalk Sudirman. The Sudirman 7.8 Virtual Office page lists the address under the Tanah Abang 1 tax office area and estimates one minute from Setiabudi Astra Station. It does not identify the travel mode for that figure, so check the route from the station exit your visitors will use.
From Dukuh Atas BNI LRT, guests can transfer to the MRT and travel one stop to Setiabudi Astra. A vOffice article estimates about five minutes for the MRT stage and about one minute for the final approach to Sudirman 7.8. The estimate excludes the interchange walk, queues, and the wait for an MRT train.
The City Tower: a Thamrin address from Dukuh Atas
The City Tower sits on the MH Thamrin corridor and is listed under the Menteng 2 tax office area. It is relevant to professional service companies that meet clients on the Thamrin side of the business district, including around Grand Indonesia and Plaza Indonesia. The The City Tower Virtual Office page provides plan and facility details to review before booking.
A vOffice article estimates that The City Tower is about a nine-minute walk from Dukuh Atas BNI MRT Station. Visitors arriving on the LRT need additional time to leave the LRT platform and reach the start of that walking route. From Setiabudi Astra MRT, an easy route to explain is one stop north to Dukuh Atas BNI MRT, followed by the walk to the building.
Atria Sudirman: continue to Bendungan Hilir MRT
Atria Sudirman suits businesses that frequently meet clients near Bendungan Hilir and Citywalk Sudirman. The Atria Sudirman Virtual Office is listed under the Tanah Abang 1 tax office area. Its location page also lists building facilities including restaurants, a minimarket, a coffee shop, and a prayer room.
For visitors arriving at Dukuh Atas BNI LRT, the route described in a vOffice article involves transferring to Dukuh Atas BNI MRT, travelling to Bendungan Hilir, and then walking for about three minutes. That article estimates the MRT stage at about four minutes. Someone already at Setiabudi Astra MRT can travel one stop to Bendungan Hilir before walking to the building. Check the exit and road crossings before sending directions.
Match the address to the way your business receives visitors
If clients commonly arrive by LRT from Bekasi or Cibubur, inspect the entire route from the LRT platform to the building lobby. An MRT connection can simplify directions to Sudirman 7.8 or Atria Sudirman. For The City Tower, visitors can assess the walking route from the Dukuh Atas area. The right choice depends on where they start, their walking needs, the weather, and where their next meeting takes place.
The virtual office plan must also fit daily operations. Decide who collects mail, how frequently your team needs meeting rooms, and whether clients will visit reception. If you intend to use the address for a PT or foreign-owned PT PMA, explain your business activity and documentation needs to vOffice so the address and plan can be reviewed for your circumstances.
Know which station your visitors use most?
Match their route with the business address, mail support, and facilities in your chosen vOffice plan.
- Ministry of Transportation of the Republic of Indonesia. (2023). JPM Dukuh Atas: Simbol Integrasi Antarmoda. Retrieved from
https://dephub.go.id/post/read/jpm-dukuh-atas—simbol-integrasi-antarmoda - vOffice. (2024). Recommendations for Office Buildings Near Sudirman Station. Retrieved from
https://voffice.co.id/blog/en/office-buildings-near-sudirman-station/ - vOffice. (2026). Virtual Office Sudirman 7.8. Retrieved from
https://voffice.co.id/en/services/virtual-office-sudirman-78 - vOffice. (2026). Virtual Office The City Tower. Retrieved from
https://voffice.co.id/en/services/virtual-office-the-city-tower - vOffice. (2026). Virtual Office Atria Sudirman. Retrieved from
https://voffice.co.id/en/services/virtual-office-atria-sudirman









